Silica Control At Reserve Mining Company

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 528 KB
- Publication Date:
- Jan 1, 1983
Abstract
Reserve Mining Company completed construction on a major process modification project in June of 1980. These modifications enabled Reserve to reduce and control its final iron ore pellet silica content from 9.0 20.77 percent to 5.0 50.26 percent. The paper outlines the implementation of neutron activation on-line analysis and associated computer control loops for measuring and closely controlling the silica content of the iron ore concentrate at Reserve Mining Company. It contains a general overview of Reserve's taconite processing facilities and a presentation of the theory and operation of the neutron activation analysis equipment coupled with the computer silica control loops.
Citation
APA:
(1983) Silica Control At Reserve Mining CompanyMLA: Silica Control At Reserve Mining Company. Society for Mining, Metallurgy & Exploration, 1983.