Simulation For Equipment Sizing, Longwall To Stockpile

Society for Mining, Metallurgy & Exploration
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
4
File Size:
232 KB
Publication Date:
Jan 1, 2008

Abstract

When longwall equipment is being specified, a nominal capacity is generally given on which to base the design of the various face and out-bye systems and components. This capacity generally comes from a nominal annual capacity requirement based on realistic utilization rates. From illustrative examples of simple system simulation, this paper sets out to show that a single nominal capacity is not sufficient to size the different systems. The manner in which the Longwall is operated and the overall system configuration and availability can have a significant impact on overall productivity.
Citation

APA:  (2008)  Simulation For Equipment Sizing, Longwall To Stockpile

MLA: Simulation For Equipment Sizing, Longwall To Stockpile. Society for Mining, Metallurgy & Exploration, 2008.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account