Slurry Loading of Ironsand Concentrate Attaharoa

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 10
- File Size:
- 810 KB
- Publication Date:
- Jan 1, 1980
Abstract
Since October 1972, New Zealand Steel Mining Ltd has loaded around ten million tonnes of ironsand concentrate from single-point mooring buoys located off-shore at Taharoa on the west coast of the North Island of New Zealand. Before the first off-shore loading system was installed a considerable research effort was applied to proving the slurry loading technique. Subsequently the system has been expanded and a new buoy, pipelines and pumping system were installed in early 1978. Since then 110 000 DWT class ore carriers have been loaded at rates of around 2600 tonnes per hour through twin submarine pipelines. This paper reviews the operation of the ship loading system and attempts to answer the question: 'If the Taharoa operation were to be planned in 1980, would the same research spending be necessary or have published research results since, made such practical tests unnecessary?'
Citation
APA:
(1980) Slurry Loading of Ironsand Concentrate AttaharoaMLA: Slurry Loading of Ironsand Concentrate Attaharoa. The Australasian Institute of Mining and Metallurgy, 1980.