Slurry TBM Tunnel In Rock, The Modified Detroit River Outfall No. 2

Society for Mining, Metallurgy & Exploration
William H. Hansmire
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
339 KB
Publication Date:

Abstract

The Modified Detroit River Outfall No. 2 (MOD DRO-2) will discharge treated wastewater to the Detroit River. Construction of a 6.4-m-diameter, 1.9-km-long tunnel was halted in 2003 by flooding during tunneling with an open face hard rock TBM. A new design for a higher rock tunnel, a ?Modified? design, was completed in 2007 and Notice to Proceed to the tunnel contractor was given in November 2008. Project duration is four years for completion of tunneling and start of outfall tunnel operation. This tunneling project has high groundwater pressure (5 bar), pervious limestone rock of up to 140 MPa (20,000 psi) strength, and hydrogen sulphide in the groundwater. The new tunnel will be connecting to access shafts and outfall diffuser riser shafts previously built for the now-abandoned tunnel. The new tunnel design construction contract, and initial planning to use a pressurized-face (slurry) hard rock TBM are presented.
Citation

APA: William H. Hansmire  Slurry TBM Tunnel In Rock, The Modified Detroit River Outfall No. 2

MLA: William H. Hansmire Slurry TBM Tunnel In Rock, The Modified Detroit River Outfall No. 2. Society for Mining, Metallurgy & Exploration,

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account