Small footprint, big challenges: Design and construction of the Allen Park storage tunnel

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 8
- File Size:
- 22739 KB
- Publication Date:
- Jan 1, 2013
Abstract
The Allen Park Sanitary Sewer Overflow (SSO) Tunnel and relief sewer project, located in the city of Allen Park, MI, is a long-term corrective action designed to bring Sanitary District One?s sanitary system into compliance with its 2005 consent order and service contract with the Detroit Water and Sewerage Department (DWSD). The $20 million project is intended to reduce Allen Park?s wet weather discharges to DWSD, reduce bypass pumping to the Ecorse Creek and limit the future risk of basement flooding by providing storage during wet weather events and eliminating hydraulic bottlenecks in the sanitary sewer system.
Citation
APA:
(2013) Small footprint, big challenges: Design and construction of the Allen Park storage tunnelMLA: Small footprint, big challenges: Design and construction of the Allen Park storage tunnel. Society for Mining, Metallurgy & Exploration, 2013.