Smelter Major Shut-Down 1992

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 13
- File Size:
- 173 KB
- Publication Date:
- Jan 1, 1994
Abstract
In May 1992, MEXICANA DE CANANEA, S.A. DE C.V. finalized the life of its Reverberatory Furnace which lasted 16 years. This created the need to prepare the Smelter for the next campaign.
Citation
APA:
(1994) Smelter Major Shut-Down 1992MLA: Smelter Major Shut-Down 1992. The Minerals, Metals and Materials Society, 1994.