Solution Management at the Mantoverde Division of Anglo American Chile

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 8
- File Size:
- 558 KB
- Publication Date:
- Jan 1, 2007
Abstract
Mantoverde is a heap leach-SX-EW operation that was commissioned in December 1995 at a production rate of 42,130 ton of copper per year and 5.4 million ton of ore per year. Copper production has been steadily increased to reach 62,000 ton in 2005. The forecast copper production for 2006 is 60,300 ton for an ore treatment rate of 9.5 million ton. A first dump leach operation was started in 1999 at a production rate of 1,922 ton of copper. A second dump leach operation was started in early 2002 at a production rate of 2,805 ton of copper. Dump leach production will be increased over time to as much as 24,000 ton of copper. Several improvements in the heap leach process have been implemented to cope with the higher ore throughput and copper production. However, the solvent extraction plant has remained unchanged which has resulted in a lower availability of raffinate solution and, as a consequence, in longer leach cycles. Different studies have been undertaken in order to optimize the solution management system at Mantoverde, including column test work aimed to reduce the leach cycle and solvent extraction plant modifications aimed to increase the raffinate solution availability. The test work program and the economical evaluations carried out, as well as the conclusions and recommendations obtained, are discussed in this paper.
Citation
APA:
(2007) Solution Management at the Mantoverde Division of Anglo American ChileMLA: Solution Management at the Mantoverde Division of Anglo American Chile. Canadian Institute of Mining, Metallurgy and Petroleum, 2007.