Some Metallurgical and Engineering Aspects of the Rum Jungle Water Treatment Plant
    
    - Organization:
 - The Australasian Institute of Mining and Metallurgy
 - Pages:
 - 8
 - File Size:
 - 162 KB
 - Publication Date:
 - Jan 1, 1984
 
Abstract
The reasons for including treatment of water in  Whites and Intermediate open cuts in the overall  rehabilitation strategy are given in the  introduction. The target quality of the treated  water also is discussed. Equipment selections are  reviewed and reasons given as to why certain  choices were made. The differences between this  plant and an ore dressing mill are highlighted. An  outline of the operating procedure is included along  with a basic flowsheet. Cost estimates are briefly  Discussed.
Citation
APA: (1984) Some Metallurgical and Engineering Aspects of the Rum Jungle Water Treatment Plant
MLA: Some Metallurgical and Engineering Aspects of the Rum Jungle Water Treatment Plant. The Australasian Institute of Mining and Metallurgy, 1984.