Start up and Operational Optimization of the 800 TM. Oxial Oxygen Plant at the Caletones Copper Smelter - El Teniente Division of Codelco Chile

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 13
- File Size:
- 617 KB
- Publication Date:
- Jan 1, 2007
Abstract
The start up and operational optimization of the No. 3 Oxygen Plant at the Caletones Copper Smelter of the Codelco - Chile El Teniente Division is summarized. In addition, the economic impact of such optimization on the production cost of oxygen and others aspects associated to the operational robustness as well is detailed.
Citation
APA:
(2007) Start up and Operational Optimization of the 800 TM. Oxial Oxygen Plant at the Caletones Copper Smelter - El Teniente Division of Codelco ChileMLA: Start up and Operational Optimization of the 800 TM. Oxial Oxygen Plant at the Caletones Copper Smelter - El Teniente Division of Codelco Chile. Canadian Institute of Mining, Metallurgy and Petroleum, 2007.