Still Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice Fill

The Australasian Institute of Mining and Metallurgy
Andersson PO
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
6
File Size:
564 KB
Publication Date:
Jan 1, 1998

Abstract

Boliden Mineral AB Boliden Mineral AB operates nine mines in Northern and Central Sweden, producing zinc, lead and silver concentrates and copper and gold. Seven of these mines use cut and fill (C&F) mining with a total production of 2 Mtonnes of ore per year.
Citation

APA: Andersson PO  (1998)  Still Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice Fill

MLA: Andersson PO Still Pillar Mining - An Evaluation of Requirements and Techniques for Stabilisation of Bottom Slice Fill. The Australasian Institute of Mining and Metallurgy, 1998.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account