Study on Mining Method in Deep Position of Jinchuan Nickel Mine, China

The Australasian Institute of Mining and Metallurgy
L Qiao C Li S Wang
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
4
File Size:
139 KB
Publication Date:
Jan 1, 2000

Abstract

Jinchuan nickel mine is the largest nickel mine in China. Cut-and-fill mining method with high density cementing materials is used in the mine. The original mining design divided the mining operation into two steps. The first step stopped the mining rooms and the second step stopped the pillars. Because the two-step method made big trouble for finally mining pillars and strongly limited the mining speed and production, it was successfully changed to a continuous cut-and-fill method without pillars. However, the mining operation in the mine has been down to 800 m and the mining condition is getting worse and more complicated. Through systemetical field investigations and 3D FEM analysis, it is proved that the mining method without pillars is feasible for mining deeper orebodies in Jinchuan nickel mine.
Citation

APA: L Qiao C Li S Wang  (2000)  Study on Mining Method in Deep Position of Jinchuan Nickel Mine, China

MLA: L Qiao C Li S Wang Study on Mining Method in Deep Position of Jinchuan Nickel Mine, China. The Australasian Institute of Mining and Metallurgy, 2000.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account