Subsidence monitoring at a shallow partial extraction room-and-pillar mine in midwestem United State

- Organization:
- International Conference on Ground Control in Mining
- Pages:
- 8
- File Size:
- 2389 KB
- Publication Date:
- Jan 1, 1989
Abstract
Subsidence may be observed above partial extraction shallow room-and-pillar mines where the coal seam(s) is associated with weak and thick claystone in the floor. This paper presents results of subsidence studies at such a mine. During the 26-month study period, a time dependent subsidence causing a maximum vertical movement of 50 mn was observed. After a subsidence rate of 6.0-6.5 m/month for the first two months after development of mine workings, the rate decreased to 0.8-0.9 mm/month after 17 months. However, presumably due to settlement of barrier pillars, it increased therafter to 1.7 mm/month for the next 9 months. Angle of draw, based on zero subsidence, was calculated to be about 29 degrees. Maximum tensile strain and compressive strain values observed were 0.040 pct and 0.039 pct respectively. A hypothesis was fomlated to correlate surface subsidence movements with observed underground movments. The data collected to date fits reasonably well within the formulated hypothesis.
Citation
APA:
(1989) Subsidence monitoring at a shallow partial extraction room-and-pillar mine in midwestem United StateMLA: Subsidence monitoring at a shallow partial extraction room-and-pillar mine in midwestem United State. International Conference on Ground Control in Mining, 1989.