Summersville Raw Water Intake

Society for Mining, Metallurgy & Exploration
Douglas Banks
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
4438 KB
Publication Date:
Jan 1, 2005

Abstract

Construction for the new 2.5 MGPD raw water intake project commenced December 2002. The project, initially designed as a 12' Ø concrete lined intake shaft,145' deep, with two offset 24" lake taps, 520' and 470' long was subsequently “value engineered” running the two lake taps through a single conduit. The offset for summer and winter pools was accomplished via a second shaft located at the lakes edge. Construction involved the use of blind drilling techniques for the shaft development and drill and blast techniques for the tunneling. All works were completed through extremely hard crystallized sandstone. The project came online August 12, 2004.
Citation

APA: Douglas Banks  (2005)  Summersville Raw Water Intake

MLA: Douglas Banks Summersville Raw Water Intake. Society for Mining, Metallurgy & Exploration, 2005.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account