"This paper describes the automation of Kiena's grinding circuit which comprises an open SAG mill circuit and a closed ball mill circuit with two stages of hydrocyclones. The circuit has been instrumented according to a two level control strategy.The regulatory control strategy is implemented in an industrial controller. This controller does data filtering and calculation (flowrate and solid content) and regulates the pump box levels (2), the water additions: or the pulp percent solids (4) and the fresh ore feed rate.The supervisory control calculates for the industrial controller, the fresh ore feed rate setpoint and the pulp percent solids setpoints in order to optimize the grinding circuit operation. It is made of two modules, one for data filtering and one for control optimization. The filtering program uses modern tools to adjust the measured value and estimate missing data (dynamic material balance, on line estimation of model parameter, etc.). The control program acts as an expert system which combines the benefits of model-based control and rule-based control. A multivariable predictive controller (DMC) is used to maintain the circulating load and the hydrocyclones feed percent solids (which is correlated to particle size) while the rule-based control validates the previous output, detects and avoids the SAG overloads and sump pumps overflows.The system has been operating since MAY 1992 and the benefits obtained are discussed.INTRODUCTIONIn 1990, Les Mines d'Or Kiena decided to go ahead with a project for automating its grinding circuit as proposed by the Centre de recherché minerals (CRM). Its objectives in doing so were to marginally increase production capacity (1 % ) and to create a new challenge for plant staff. The main stages of the project, which involved CRM, Kiena Mines and a consultant, are shown in Table 1. The project was completed in May 1992 with the implementation of a supervisory control system. This text describes the main features of the system with a special focus on its most innovative aspects."
Citation

APA: M. Bourassa P. Roy  (1993)  Supervisory Control in the Grinding Circuit at Les Mines d'Or Kiena

MLA: M. Bourassa P. Roy Supervisory Control in the Grinding Circuit at Les Mines d'Or Kiena. Canadian Institute of Mining, Metallurgy and Petroleum, 1993.