Systemized Maintenance Pays Off

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 12
- File Size:
- 465 KB
- Publication Date:
- Jan 1, 1975
Abstract
Butler Taconite, operated by the Hanna Mining Company, is an Iron ore pelletizing operation that is located on the Western end of the Mesabi Iron Range in Northeastern Minnesota. The operation mines low-grade taconite ore and through primary crushing, two stage grinding, magnetic separation, agglomerating and indurating, produces 2.6 million annual tons of high quality, 66% iron pellets. Mining and stripping is done with 13 - M100 trucks and 5 - 12 cu. yd. shovels. The operating processes in the concentrator and pellet plant are primarily con¬trolled through a centralized control room and monitored by a PDP l140 computer. During 1969 and 1970, a re-organization of the Company took place. Through this re-organization, each mine unit was analyzed and studied to determine the proper staffing of the internal departments. At this time, it was decided to continue with further detailed studies of the Maintenance Department with the intent to reduce maintenance costs. Maintenance costs at the time of the re-organization were 38.6% of the total mine operating cost. The preliminary study indicated that the Maintenance Department had a system of maintenance, as a matter of fact, it had a separate system in each sub-maintenance division and in some of the sub-divisions each foreman had a system of his own. Therefore, from the data collected, it was decided to develop one system of maintenance that could be utilized throughout the entire operation. To determine the type of system suitable to all phases of the operation, detailed time and method studies were conducted. All types of maintenance tasks performed at the operation were studied. The data collected was analyzed and the recommended improved methods were reviewed with the Maintenance Superintendent and his staff. The new improved methods that were accepted as feasible, were introduced into the system immediately.
Citation
APA:
(1975) Systemized Maintenance Pays OffMLA: Systemized Maintenance Pays Off. Society for Mining, Metallurgy & Exploration, 1975.