Taking High Voltage Underground

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 2
- File Size:
- 818 KB
- Publication Date:
- Oct 1, 1956
Abstract
Alpha Portland Cement Co.'s mining operations at Manheim W. Va., produce 750,000 bbl of limestone yearly, averaging 2200 bbl per working day. Thirteen parallel entries have been driven to date, each almost 30 ft high and about 45 ft wide, extending back 5000 ft to the working faces. Pitch of the seam from the lowest to the highest entries is steep enough to provide excellent year- round natural ventilation, and this, together with the size of the entries and a good bottom, has allowed face crews to drive right up to the working areas in the family car.
Citation
APA: (1956) Taking High Voltage Underground
MLA: Taking High Voltage Underground. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1956.