TBM Excavability: Prediction and Machine–Rock Interaction

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 13
- File Size:
- 1309 KB
- Publication Date:
- Jan 1, 2007
Abstract
TBM case histories from over 400 tunnel sections are analyzed presenting a comprehensive application of the Rock Mass Excavability (RME) index (Bieniawski et al.2006). The paper introduces two new adjustment factors, called the Factor of Tunnel Length and the Factor of Crew Effectiveness, which were established to represent more realistically the interaction of the rock mass characteristics, the TBM parameters and the performance of the crew operating the machine. A new correlation is provided for predicting the average rate of advance of double-shield TBMs working specifically in the double-shield mode.
Citation
APA:
(2007) TBM Excavability: Prediction and Machine–Rock InteractionMLA: TBM Excavability: Prediction and Machine–Rock Interaction. Society for Mining, Metallurgy & Exploration, 2007.