TBM Excavation Of Rogers Pass Railroad Tunnel

Society for Mining, Metallurgy & Exploration
Gail B. Knight
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
500 KB
Publication Date:
Jan 1, 1987

Abstract

INTRODUCTION In May 1984, The Canadian Pacific Railway awarded to the Joint Venture of Foundation of Canada, Ltd. of Toronto, Atlas Construction Co. of Montreal, and S. A. Healy Co. of Chicago the contract for the construction of 27,000 ft of tunnel starting from the east portal. Selkirk contractors, the Joint Venture of Foundation, Atlas and Healy, which had successfully completed for CPR in 1983 the construction of both portal structures for this tunnel, studied several different alternative proposals before presenting its bid pooling each individual company's technical resources and experiences. (Foundation had just completed in association with other companies a similar tunnel project in British Columbia, and the S. A. Healy Co. could provide its experience of more than 40 miles of tunnels excavated by full face boring machines.) Among the alternatives investigated there was a fully circular tunnel to be excavated by a 30 ft diameter TBM, a full section drill and shoot proposal, and a mixed alternative, the "key hole" proposal, consisting of a TBM driven circular top heading followed by benching to design size. Technical, geological and economical considerations determined the alternative that was eventually proposed to CPR. HISTORICAL NOTES The tunnel construction parallels an existing tunnel through the Selkirk mountains that was excavated in 1885. In order to reduce the grade to 1% on the heavily loaded west bound trains, the new tunnel was at a lower elevation and lengthened to almost 9 miles. GEOTECHNICAL INFORMATION CP Rail site investigations began in 1978. The surface rocks in the tunnel construction area are metamorphosed Cambrian and Pre-Cambrian sediments; the underlying formation contains fine and coarse grained rocks presenting different degrees of metamorphism. The
Citation

APA: Gail B. Knight  (1987)  TBM Excavation Of Rogers Pass Railroad Tunnel

MLA: Gail B. Knight TBM Excavation Of Rogers Pass Railroad Tunnel. Society for Mining, Metallurgy & Exploration, 1987.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account