Technical and economic optimisation of an underground limestone mine

The Southern African Institute of Mining and Metallurgy
M. B. Díaz Aguado C. González Nicieza I. Á. Fernández B. S. Menéndez
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
10
File Size:
654 KB
Publication Date:
Jan 1, 2003

Abstract

This paper summarizes the works that the Research “Group of Ground Engineering”, belonging to the Mining Department of the University of Oviedo, Spain, has been developing in close cooperation with the Regional Mining Department, since 2001, in order to control and monitor an experimental underground limestone exploitation by the room and pillars method. The aim of the current research is not only the geotechnical characterization of the rock mass (by means of laboratory and site tests) or the instrumentation of its displacements and stress changes (using convergence meters, INCREX probe, extensometers and rigid inclusion cells), but, moreover, to undertake intensive monitoring and control of such pilot mine, which is mined exclusively in order to accomplish this research. The data transmission was made on line via Internet, to achieve a full understanding of the behaviour of the experimental mine, to access data from remote locations and to visualize results from a website. All the collected information becomes input data for several numerical models using finite differences under a program developed in the research Group, ALMEC. The simulation and a final economical analysis lead to a design of an underground exploitation, at production scale, for a resource that is traditionally mined by means of open-pit process methods that could be worked underground with less environmental impact. The main purpose achieved by this exhaustive analysis is the technical and economic viability of such mine, for their optimisation for a future productive exploitation.
Citation

APA: M. B. Díaz Aguado C. González Nicieza I. Á. Fernández B. S. Menéndez  (2003)  Technical and economic optimisation of an underground limestone mine

MLA: M. B. Díaz Aguado C. González Nicieza I. Á. Fernández B. S. Menéndez Technical and economic optimisation of an underground limestone mine. The Southern African Institute of Mining and Metallurgy, 2003.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account