The Application of Advanced Undercutting at PT Freeport IndonesiaÆs Deep Ore Zone Mine

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 4
- File Size:
- 266 KB
- Publication Date:
- Jan 1, 2002
Abstract
PT Freeport Indonesia is currently building the DOZ mine. It is a 25 000 tonne/day block caving operation which is scheduled to reach designed production levels by the fourth quarter of 2002. This paper describes some of the issues and challenges faced by the operation when introducing a new undercut method part way through the project. Advantages and disadvantages are discussed as well as the expected benefits of the new method.
Citation
APA:
(2002) The Application of Advanced Undercutting at PT Freeport IndonesiaÆs Deep Ore Zone MineMLA: The Application of Advanced Undercutting at PT Freeport IndonesiaÆs Deep Ore Zone Mine. The Australasian Institute of Mining and Metallurgy, 2002.