The Atlanta West Area CSO Storage Tunnel and Pumping Station Project—15 Months of Design Accomplished Within 10 Months

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 10
- File Size:
- 2481 KB
- Publication Date:
- Jan 1, 2005
Abstract
Under an extremely aggressive schedule, final design of 13.5 km (8.4 miles) miles of 8.2 m (27 ft) diameter deep rock tunnel, 322 ML/day (85 million gallons / day)submersible pumping station and associated facilities were accomplished ahead of a federal court mandated consent decree schedule. Challenges overcome by the project team in enabling timely completion of the construction documents will be presented. Discussion includes evolution of final design, consideration of future O&M requirements, and risks identified for construction and operations, together with measures to manage and proactively prepare for such risks.
Citation
APA:
(2005) The Atlanta West Area CSO Storage Tunnel and Pumping Station Project—15 Months of Design Accomplished Within 10 MonthsMLA: The Atlanta West Area CSO Storage Tunnel and Pumping Station Project—15 Months of Design Accomplished Within 10 Months. Society for Mining, Metallurgy & Exploration, 2005.