The Bethlehem Molybdenum Plant

Canadian Institute of Mining, Metallurgy and Petroleum
J. W. Smith E. A. Lowe A. F. Bellamy
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
18
File Size:
445 KB
Publication Date:
Jan 1, 1980

Abstract

"In the autumn of 1977 Bethlehem management initiated feasibility studies on recovery of by-product molybdenum from concentrate produced at the existing Highland Valley mining operation. Over the fall and winter months test work was carried forward concurrent with design, flowsheet, equipment specification and cost studies. The decision was made to go ahead with a 200 ton-per-day treatment plant. Construction started in early 1978 and progressed to an initial start-up stage in mid-June. Full operational status was reached in August 1978. Operational results through August 1979 are presented. INTRODUCTIONBethlehem Copper Corporation operates a 20,000 ton-per-day Open Pit Mine and Flotation Plant located in the Highland Valley, some 30 air miles Southwest of Kamloops and 20 miles Southeast of Ashcroft, B.C.Two open pits are worked; the Iona Pit with limited reserves of higher Mo content, and the lower grade, more extensive Jersey Pit. Upwards of 150 tons per day of bornite-chalcopyrite bulk concentrate is produced, ranging 0.25% to 1.5% in molybdenum grade depending on the area mined."
Citation

APA: J. W. Smith E. A. Lowe A. F. Bellamy  (1980)  The Bethlehem Molybdenum Plant

MLA: J. W. Smith E. A. Lowe A. F. Bellamy The Bethlehem Molybdenum Plant. Canadian Institute of Mining, Metallurgy and Petroleum, 1980.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account