The Canadian Power Situation With Particular Reference to Thermal-Electric Power

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 8
- File Size:
- 4330 KB
- Publication Date:
- Jan 1, 1958
Abstract
This paper highlights the electric power situation in Canada, and introduces brief explanation of the salient differences between electrical practice in the United States and Canada. The availability of bask energy in the two countries is touched on, also the hydro versus thermal outlook as applying to Canada. De-v2lopment of thermal-electric power is dealt with in some detail, followed by Canada's thermal-electric power requirements, present and future. The fuel requirements for steam-electric generating plant are assessed on the basis of a survey recently made, and the location and size of the major thermal plant operations are given. Fuel contractual obligations on the part ?of suppliers and consumers are mentioned. Finally, an opinion is expressed in regard to the types of f.uel in ?demand on a regional basis with emphasis on the need for coal in the several areas dealt with.
Citation
APA:
(1958) The Canadian Power Situation With Particular Reference to Thermal-Electric PowerMLA: The Canadian Power Situation With Particular Reference to Thermal-Electric Power. Canadian Institute of Mining, Metallurgy and Petroleum, 1958.