The Channel Tunnel UK – France The UK TBM Drives

Society for Mining, Metallurgy & Exploration
John C. Hester Gordon S. Crighton D. John Curtis
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
12
File Size:
808 KB
Publication Date:
Jan 1, 1991

Abstract

The six main drives needed to build 55 miles of 4.8 and 7.7 metre i.d. tunnels in 33 months called for careful co-ordination of the design of tunnel boring machines and linings. The implications of these requirements are discussed, with particular reference to the selection of tunnel liners. The solutions adopted are detailed and details are given of the specifications and procedures adopted. The design methods employed for liners are outlined. The construction methods are described and current performance figures given.
Citation

APA: John C. Hester Gordon S. Crighton D. John Curtis  (1991)  The Channel Tunnel UK – France The UK TBM Drives

MLA: John C. Hester Gordon S. Crighton D. John Curtis The Channel Tunnel UK – France The UK TBM Drives. Society for Mining, Metallurgy & Exploration, 1991.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account