The DC WASA Anacostia River CSO Control Tunnel Project

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 9
- File Size:
- 233 KB
- Publication Date:
- Jan 1, 2007
Abstract
On the east side of Washington DC, the DC Water & Sewer Authority is developing a Facility Plan for the Anacostia River CSO Control Projects, including 8 to 12 miles of CSO storage/conveyance and flood relief tunnels and associated facilities. The project includes major technical and non-technical challenges, including: completion under a Federal Consent Decree schedule; large diameter (estimated 25 to 35 ft) soft ground tunnels and shafts up to 200 ft depth; operations without use of active flow control systems; and close coordination with several major public and private construction and development projects that are being advanced in the project area.
Citation
APA:
(2007) The DC WASA Anacostia River CSO Control Tunnel ProjectMLA: The DC WASA Anacostia River CSO Control Tunnel Project. Society for Mining, Metallurgy & Exploration, 2007.