The DC WASA Anacostia River CSO Control Tunnel Project

Society for Mining, Metallurgy & Exploration
Larry Williamson Leonard R. Benson David C. Girard Ronald E. Bizzarri
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
9
File Size:
233 KB
Publication Date:
Jan 1, 2007

Abstract

On the east side of Washington DC, the DC Water & Sewer Authority is developing a Facility Plan for the Anacostia River CSO Control Projects, including 8 to 12 miles of CSO storage/conveyance and flood relief tunnels and associated facilities. The project includes major technical and non-technical challenges, including: completion under a Federal Consent Decree schedule; large diameter (estimated 25 to 35 ft) soft ground tunnels and shafts up to 200 ft depth; operations without use of active flow control systems; and close coordination with several major public and private construction and development projects that are being advanced in the project area.
Citation

APA: Larry Williamson Leonard R. Benson David C. Girard Ronald E. Bizzarri  (2007)  The DC WASA Anacostia River CSO Control Tunnel Project

MLA: Larry Williamson Leonard R. Benson David C. Girard Ronald E. Bizzarri The DC WASA Anacostia River CSO Control Tunnel Project. Society for Mining, Metallurgy & Exploration, 2007.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account