The Engineering, Procurement and Construction of the Éléonore Project

Canadian Institute of Mining, Metallurgy and Petroleum
C. Fréchette M. Kreuh A. Fortin
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
12
File Size:
1015 KB
Publication Date:
Jan 1, 2015

Abstract

Éléonore project is a gold ore processing plant at a mine site located near James Bay, Quebec, Canada. SNC-Lavalin was mandated by Goldcorp to perform EPCM services on the ore processing plant and permanent infrastructures of the project following an internal pre-feasibility study. The project incurred considerable challenges due to fast-tracking from a pre-feasibility to detailed engineering and construction. The paper reviews how the EPCM was carried out. Some of the challenges resulting from skipping the feasibility study stage are discussed. The paper also presents how multiple offices across Canada were used for the engineering design.
Citation

APA: C. Fréchette M. Kreuh A. Fortin  (2015)  The Engineering, Procurement and Construction of the Éléonore Project

MLA: C. Fréchette M. Kreuh A. Fortin The Engineering, Procurement and Construction of the Éléonore Project. Canadian Institute of Mining, Metallurgy and Petroleum, 2015.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account