The Evaluation Of The AAC Pump-Cell Circuits At Anglogold?s West Wits Operations

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 8
- File Size:
- 744 KB
- Publication Date:
- Jan 1, 2002
Abstract
This paper discusses the comparative performances of the three activated carbon adsorption circuits at the West Wits operations of Anglogold. These circuits consist of two pump-cell circuits (at Two Plant, formerly Elandsrand and at Three plant) and a conventional counter-current adsorption circuit (at Mponeng plant). The implications of the improved performance of the pump-cell plants are discussed.
Citation
APA:
(2002) The Evaluation Of The AAC Pump-Cell Circuits At Anglogold?s West Wits OperationsMLA: The Evaluation Of The AAC Pump-Cell Circuits At Anglogold?s West Wits Operations. The Southern African Institute of Mining and Metallurgy, 2002.