Abstract
This paper describes the project implementation from financing, through the engineering and construction phases, mine and process plant commissioning as well as operating experience realized to-date. The single line flowsheet used to process the lateritic nickel ore to a 75 percent nickel matte is presented with emphasis on the main pyrometallurgical operations. These include a rotary dryer, a unique reduction kiln, a 45 000 kVA electric furnace and two Pierce-Smith type converters. Associated infrastructure facilities and services necessary to sustain the 11 300 tonnes (12 500 short tons) per year nickel production rate are also described.
Citation
APA: