The Goldstrike Autoclave Plant Design, Commissioning And Operation

Society for Mining, Metallurgy & Exploration
H. Pieterse K. S. Fraser J. R. Goode
Organization:
Society for Mining, Metallurgy & Exploration
Pages:
11
File Size:
457 KB
Publication Date:
Jan 1, 1990

Abstract

The Goldstrike autoclave plant is designed for the pressure oxidation of 1363 t/d (1500 stpd) of refractory gold ore. The plant was commissioned in early February 1990 over a one week period - an unusually short period for a plant of this complexity. The rapid plant start-up is attributed to certain detailed design and control aspects of the plant. This paper discusses key features of the autoclave plant with emphasis on the design of the splash/flash system of heat recovery and the control systems. Commissioning and plant operations over the first three months are reviewed.
Citation

APA: H. Pieterse K. S. Fraser J. R. Goode  (1990)  The Goldstrike Autoclave Plant Design, Commissioning And Operation

MLA: H. Pieterse K. S. Fraser J. R. Goode The Goldstrike Autoclave Plant Design, Commissioning And Operation. Society for Mining, Metallurgy & Exploration, 1990.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account