The Hallandsås Dual Mode TBM

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 22
- File Size:
- 781 KB
- Publication Date:
Abstract
The Hallandsås project with a long history, first started in 1991, is well known in the tunneling community. In the past it has been stopped twice for technical and environmental reasons. The third attempt started in 2004 using a dual mode rock TBM. The heterogeneous highly fractured and abrasive rock mass as well as large areas of water bearing zones present most difficult subsurface conditions. The tunneling concept is based on the use of watertight segmental lining and a TBM able to operate in open mode, possibilities for extensive pre excavation grouting and high pressure closed mode operation up to 13 bar to cover exceptional conditions.