The Investigation Of The Rock Mass Stressed-Deformed State Under The Conditions Of Floating Earth Presence In The Roof Of The Level Working

- Organization:
- International Conference on Ground Control in Mining
- Pages:
- 3
- File Size:
- 766 KB
- Publication Date:
- Jan 1, 1996
Abstract
The forecasting of floating earth inrush into the working is to a great extent connected with the investigation of the rock mass stressed-deformed state around the working. The aim of such investigations is to estimate the carrier ability of the protective layer (which is stabilized by the physico-chemical mode of fixing) and to determine it's thickness, which is to be sufficient to present the floating earth inrush into the working. We consider the protective layer to have exhausted it's carrier ability if the rocks of this layer reached the overlimit phase of deformation and it's greater part (section), which adjoins the working. is destroyed up to the limit of the remaining strength. So, the aim of investigations is to determine the size of the rocks inelastic deformation zone in the roof of the working. It is necessary to take into account the presence of water saturated seam in the roof and the overlimit characteristics of the rocks, their ability to lower the carrier capacity up to the level of the remaining strength.
Citation
APA:
(1996) The Investigation Of The Rock Mass Stressed-Deformed State Under The Conditions Of Floating Earth Presence In The Roof Of The Level WorkingMLA: The Investigation Of The Rock Mass Stressed-Deformed State Under The Conditions Of Floating Earth Presence In The Roof Of The Level Working. International Conference on Ground Control in Mining, 1996.