The Kidd Smelter Start-Up And Early Operation

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 27
- File Size:
- 1038 KB
- Publication Date:
- Jan 1, 1983
Abstract
Detailed descriptions by operating area of the Kidd copper smelter are presented, together with accounts of complement staffing, training, and preparation activities for smelter start-up in June 1981. Concentrate tonnages smelted in the first twelve months of operation were constrained by the capacity of the furnace off-gas system. However, modifications designed and introduced over that period, plus sustained efforts by operations and maintenance personnel have resulted in stepwise improvements in smelter performance.. Consistent operation at design feed rates has been well demonstrated over the third and fourth smelter campaigns and efforts continue on further improving the continuous smelter on-line times and increasing campaign life. In November 1982., following a seventeen month preproduction period, the Kidd smelter attained full operating status.
Citation
APA:
(1983) The Kidd Smelter Start-Up And Early OperationMLA: The Kidd Smelter Start-Up And Early Operation. The Minerals, Metals and Materials Society, 1983.