The mechanization of pillar extraction at The Durban Navigation Collieries (Pty) Ltd

The Southern African Institute of Mining and Metallurgy
A. Smith
Organization:
The Southern African Institute of Mining and Metallurgy
Pages:
6
File Size:
562 KB
Publication Date:
Jan 1, 1985

Abstract

After the introduction of mechanized bord-and-pillar development at Dumacol in 1958, pillars were being developed at a much faster rate than they could be extracted by hand loading methods. Efforts were therefore made to increase the rate of pillar extraction by mechanization. Following two partially successful mechanized stooping trials in 1964 and 1971, it was decided that mechanized pillar extraction with 1 m3 cable-reel front-end loaders should be introduced. The first section to employ the new equipment started production in May 1979, and the mine now has four mechanized pillarextraction sections in operation. Considerable improvements in production, productivity, safety, and percentage extraction have been achieved.
Citation

APA: A. Smith  (1985)  The mechanization of pillar extraction at The Durban Navigation Collieries (Pty) Ltd

MLA: A. Smith The mechanization of pillar extraction at The Durban Navigation Collieries (Pty) Ltd. The Southern African Institute of Mining and Metallurgy, 1985.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account