The mechanization of pillar extraction at The Durban Navigation Collieries (Pty) Ltd

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 6
- File Size:
- 562 KB
- Publication Date:
- Jan 1, 1985
Abstract
After the introduction of mechanized bord-and-pillar development at Dumacol in 1958, pillars were being developed at a much faster rate than they could be extracted by hand loading methods. Efforts were therefore made to increase the rate of pillar extraction by mechanization. Following two partially successful mechanized stooping trials in 1964 and 1971, it was decided that mechanized pillar extraction with 1 m3 cable-reel front-end loaders should be introduced. The first section to employ the new equipment started production in May 1979, and the mine now has four mechanized pillarextraction sections in operation. Considerable improvements in production, productivity, safety, and percentage extraction have been achieved.
Citation
APA:
(1985) The mechanization of pillar extraction at The Durban Navigation Collieries (Pty) LtdMLA: The mechanization of pillar extraction at The Durban Navigation Collieries (Pty) Ltd. The Southern African Institute of Mining and Metallurgy, 1985.