The Metallurgical Evaluation of AK1 Kimberlite to Establish Process Design Criteria
    
    - Organization:
 - The Australasian Institute of Mining and Metallurgy
 - Pages:
 - 10
 - File Size:
 - 532 KB
 - Publication Date:
 - Jan 1, 1984
 
Abstract
A metallurgical evaluation of the Argyle Kimberlite No. 1 (AKl) orebody has been carried  out using a 40 tonnes per hour pilot plant.  Pilot plant results, together with laboratory  investigations provided a basis for the  determination of process design criteria for a  major treatment plant. Various sampling programmes were carried  out to determine specific aspects in the  evaluation of diamond liberation. Treatment  parameters such as the top crush size, recrush  size and the bottom cut-off size were  investigated. A description of the pilot plant is given  together with the design criteria for a 3  million tonne per annum treatment plant
Citation
APA: (1984) The Metallurgical Evaluation of AK1 Kimberlite to Establish Process Design Criteria
MLA: The Metallurgical Evaluation of AK1 Kimberlite to Establish Process Design Criteria. The Australasian Institute of Mining and Metallurgy, 1984.