The New Cominco Lead Smelter at Trail

- Organization:
- The Minerals, Metals and Materials Society
- Pages:
- 14
- File Size:
- 538 KB
- Publication Date:
- Jan 1, 1990
Abstract
The lead .smelter at Cominco's operations at Trail, B.C. has been undergoing. a modernization program since 1986. In that year a contract agreement was reached with German-based Lurgi GmbH which allows Cominco to construct and operate a lead smelter using Lurgi's QSL process. Cominco Engineering Services Ltd. (CESL), a subsidiary of Cominco Ltd., was contracted to provide project management, engineering, procurement and construction management? services for the project. The new smelter replaces the existing sinter-blast furnace plant ?and will have a capacity of up to 1601000 tonnes per year of refined lead. This new smelting proc.ess results in significant operating cost reductions and major environmental .improvements. Start-up of the new plant is scheduled for the fall of 1989. The metallurgy and the operating parameters, important to the design of the new smelter, are described together with projected deportments of lead, zinc, silver and minor metals. A plant description, will be given for the following major areas that make up the modernization project: the pressure filter operation for the preparation of ,zinc leach residues feed material, the QSL reactor and boiler itself, together with its feed system and process gas treatment, and the drossing plant with a new continuous drossing furnace and oxygen softening and thallium removal. Slag from the QSL reactor will be treated in existing slag furnaces until a subsequent second phase of the modernization is completed in the 1990s.
Citation
APA:
(1990) The New Cominco Lead Smelter at TrailMLA: The New Cominco Lead Smelter at Trail. The Minerals, Metals and Materials Society, 1990.