Abstract
Discussion of the paper of FRANKLIN MOELLER, presented at the New York meeting, February, 1916, and printed in Bulletin No. 110, February, 1916, pp. 343 to 354. K. A. PAULY, Schenectady, N. Y.-I read with interest Mr. Moeller's paper descriptive of the mechanical parts of the new electric hoist at the Granite Shaft of the North Butte Mining Co. and as the paper treats largely of the mechanical equipment I have little discussion to offer. There is, however, one question which I would like to ask and that is, why the discrepancy in hoisting cycles between the curves given in the paper read by Mr. Sykes for the American Institue of Electrical Engineers at San Francisco and those given in the paper under discussion? In Mr. Sykes' curves the acceleration period is shown to be 16 sec. for all depths from 2,000 to 4,000 ft. inclusive, while Mr. Moeller in Fig. 2 shows 25 sec. throughout the range and in Fig. 4 shows 35 sec. Mr. Moeller's curves also show the following reductions in the peak load during acceleration: Level, Feet Mr. Sykes, Horsepower Mr. Moeller, Horsepower 2,060 3,500 3,130 3,000 3,800 3,480 Fig. 2 4,000 4,100 3,800 2,250 1,595 Fig. 4 As the purchaser's specifications called for 15 or 16 sec. I would like to know whether or not any modifications have been made in the requirements since the equipment has been installed.
Citation
APA:
(1916) The New Electric Hoist Of The North Butte Mining Co. (ca491289-022b-49c5-8224-e6eae403b50c)MLA: The New Electric Hoist Of The North Butte Mining Co. (ca491289-022b-49c5-8224-e6eae403b50c). The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1916.