Abstract
The North Western Sewer tunnel extends over 11.5 km in the North Western suburbs of Melbourne.The $253 million tunnel project provides a critical link in the Melbourne Sewer Network. The existing sewers fail to service the increasing demands of the growing population of the North West regions of Melbourne. This project will protect the environment and improve the standards of service of the existing system. This paper concentrates on Section three of this project, consisting of the final 4 km of the Contract, three access shafts and a cut and cover section of tunnel.Transfield Tunnelling as Head Contractor constructed the tunnel for Melbourne Water Corporation, with Enetech Streamline, formally Streamline Australia, a trading arm of Melbourne Water acting as Superintendent.Excavation of Section three of this project commenced in September 1994 and project completion is scheduled for October 1998. The tunnel passes below the residential suburb of Essendon, through some of the most challenging ground conditions ever attempted to be tunnelled in Australia.
Citation
APA:
(1999) The North Western Sewer Tunnel Project - Section 3MLA: The North Western Sewer Tunnel Project - Section 3. The Australasian Institute of Mining and Metallurgy, 1999.