The Northwest Side Relief Sewer Tunnel—Challenges Became Success Stories

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 11
- File Size:
- 813 KB
- Publication Date:
- Jan 1, 2005
Abstract
The Milwaukee Metropolitan Sewerage District’s (MMSD)’s challenges of basement flooding and wet weather sewer overflows are being creatively addressed with the Northwest Side Relief Sewer tunnel. The $132 million, 20-foot diameter, and37,740 feet long conveyance and storage tunnel excavation in dolomite at depths reaching 165 feet below ground surface has been successfully completed within13 months in April 2004. This paper includes Owner’s perspective on the overall project, and the design and construction details by the Designer and the Contractor. The project contract documents included a comprehensive Geotechnical Data Report and the Geotechnical Baseline Report.
Citation
APA:
(2005) The Northwest Side Relief Sewer Tunnel—Challenges Became Success StoriesMLA: The Northwest Side Relief Sewer Tunnel—Challenges Became Success Stories. Society for Mining, Metallurgy & Exploration, 2005.