The optimization of raise-connection spacing in gold mines

- Organization:
- The Southern African Institute of Mining and Metallurgy
- Pages:
- 11
- File Size:
- 991 KB
- Publication Date:
- Jan 1, 1983
Abstract
A method for the calculation of the economic optimum spacing of raise connections in 'scattered' mining layouts is described. The method of calculation and the results obtained in a case study are presented. An indication of how the overall optimum spacing (which satisfies both economic and geological considerations) can be determined is also given. " The case study demonstrates that, even with the present strike-cleaning systems,significant savings in working costs can result from an increase in the spacing between raise connections. Furthermore, improvement of the present systems would result in a considerable increase in these savings.
Citation
APA:
(1983) The optimization of raise-connection spacing in gold minesMLA: The optimization of raise-connection spacing in gold mines. The Southern African Institute of Mining and Metallurgy, 1983.