The Owner?s Manual on Contracting Strategies for Large Projects ? Introduction

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 8
- File Size:
- 465 KB
- Publication Date:
- Jan 1, 2008
Abstract
The owners of large infrastructure projects are challenged on how to implement sound engineering and construction contracting strategies that address their prime expectations: a quality job, on time and within budget. With the increasing number of large engineering and construction projects worldwide, owners continue to search for alternative contracting strategies to address their risk, quality, sustainability (operability and performance), schedule, and budget concerns. Coupled with the shortage of resources, delays, political pressures, and other obstacles in procurement and negotiation processes, engineers and contractors are also looking for creative ways to optimize contract packaging strategies for efficient and successful project delivery. This paper compiles an array of decision making criteria and suggests a balanced evaluation, ranking and selection strategy in procurement of both engineering and construction services for large tunneling and other infrastructure projects. A number of owners? general preferences and viewpoints are discussed on large tunnel programs encompassing water and wastewater conveyance systems, pump stations and treatment facility upgrades. Contract packaging strategies and project phasing and segmenting alternatives for preliminary engineering, final design, construction management, and actual construction of facilities are featured for several large water and wastewater infrastructure projects. While the selection (and the relevant selection process and criteria) and performance of service providers, whether for engineering or construction, have profound effects on the outcome of any given project, this paper only examines strategies for con-tract packaging. More specifically, the authors evaluated case studies and developed a range of recommendations for packaging of large water and wastewater infrastructure projects with multiple components.
Citation
APA:
(2008) The Owner?s Manual on Contracting Strategies for Large Projects ? IntroductionMLA: The Owner?s Manual on Contracting Strategies for Large Projects ? Introduction. Society for Mining, Metallurgy & Exploration, 2008.