The Reconstruction Of The Main Interceptor Sewer Lower Bristol Road, Bath

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 20
- File Size:
- 1245 KB
- Publication Date:
- Jan 1, 1981
Abstract
Smallbore tunnels in urban environments often present more technical and managerial problems than major large diameter schemes carried out for transportion, water supply and hydro-electric facilities. The 1.8 km Bath scheme was designed for construction in tunnel using the pipe jacking system. Unforeseen ground conditions meant other techniques were needed during construction. The paper describes the problems encountered and how they were overcome.
Citation
APA:
(1981) The Reconstruction Of The Main Interceptor Sewer Lower Bristol Road, BathMLA: The Reconstruction Of The Main Interceptor Sewer Lower Bristol Road, Bath. Society for Mining, Metallurgy & Exploration, 1981.