The Role of Position of Initiation and Stemming on Breakage

- Organization:
- International Society of Explosives Engineers
- Pages:
- 10
- File Size:
- 92 KB
- Publication Date:
- Jan 1, 1998
Abstract
The course of motorway tunnel under construction was set only 2 m away from the main motorway. The thickness of the tunnel overburden rock was 9 m. During the tunnel construction the traffic on the motorway was not supposed to be interrupted. The tunneling was carried out by NATM with classical drilling of blastholes and by blasting.