The Salida Smelter

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 5
- File Size:
- 251 KB
- Publication Date:
- Jan 8, 1915
Abstract
THE Salida smelting plant, owned by the Ohio & Colorado Smelting & Refining Co., is situated at an altitude of 7,000 ft., about 2 miles west of Salida, Colo., and 215 miles southwest of Denver. Salida is a division point on the. Denver & Rio Grande R. R. where the narrow-gauge line serving the Sari Juan region joins the through standard gauge. This narrow-gauge road also serves the coal and coke companies at Crested Butte and the lime quarries and mines at Monarch and Garfield, which are only 20 miles distant. These facts, together with the possibility of an appropriate site, doubtless influenced the builders to locate at this point. The smelting plant and yard occupy 80 acres of land on the northeast side of the Arkansas River. The slope of the ground is such as to permit of the ore being delivered by cars at a point 25 ft. above the feed floor; and in front of the furnaces there is a fall of 50 ft. for the slag clump. A recent purchase of river bottom has provided slag room for 20 years. As originally constructed, the plant consisted of four blast furnaces, 40 by 144 in. at tuyeres, two copper-matting furnaces, dust chamber, stack, power plant, blowers, sampling works, and one railroad trestle about 16 ft. from bed floor to rails. Later 12 hand roasters of excellent design were added and the practice of smelting leady matte in-a copper-matting furnace was abandoned. Since the plant passed under the present management the equipment has been increased so that the following is a brief description of the same at this date: Two lead blast. furnaces, 48 by 180 in. at tuyeres, 17 ft. 6 in. tuyères to feed floor; four lead blast furnaces, 40 by 144 in. at tuyères, 17 ft. 6 in. tuyères to feed floor; two copper-matting furnaces, not used; blast-furnace flue, 900 ft.; area 245 sq. ft.; blast-furnace stack, 150 ft.; above furnace floor, 190 ft. When smelting a 500-ton charge per day, the gases approximate 63,700 cu. ft. per minute and travel at a speed of 260 ft. per minute.
Citation
APA:
(1915) The Salida SmelterMLA: The Salida Smelter. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1915.