The Status of Permitting for a Uranium Mine or Mill

- Organization:
- The American Institute of Mining, Metallurgical, and Petroleum Engineers
- Pages:
- 9
- File Size:
- 627 KB
- Publication Date:
- Jan 1, 1980
Abstract
A good deal of dialogue has been published and voiced concerning one mining regulation or another, that, according to those raising the issues, in effect shuts down or drastically reduces mine and/or mill reduction. The objective of this discussion is to there fore synthesize the various regulations affecting the uranium mining industry and attempt to realistically assess the extent of impact to yellowcake production - on both an individual and collective basis. Emphasis is placed on the later or newer permitting requirements under the Mill Tailings Act, Underground Injection Control Program, the Consolidated Permit Program, and the Resource Conservation and Recovery Act (RcRA).
Citation
APA:
(1980) The Status of Permitting for a Uranium Mine or MillMLA: The Status of Permitting for a Uranium Mine or Mill. The American Institute of Mining, Metallurgical, and Petroleum Engineers, 1980.