The Underground Connection Line Between South and North Stations Beijing

- Organization:
- The Australasian Institute of Mining and Metallurgy
- Pages:
- 7
- File Size:
- 855 KB
- Publication Date:
- Jan 1, 1987
Abstract
Due to the increase of passenger traffic, a new station is proposed which is about 6.8km from south station. An underground connection line is under feasibility study for connecting these two stations in order to avoid the in- terference with surface traffic. In this paper the traffic condi- tion and the geological formation along the planned route will be described and analysed. Different methods of con struction have been proposed and dis- cussed such as shield method, slurry wall method etc. In this paper compari- sons are made among these methods and advantages and disadvantages given. The authors proposal to construct this connection line by NATM raise wide
Citation
APA:
(1987) The Underground Connection Line Between South and North Stations BeijingMLA: The Underground Connection Line Between South and North Stations Beijing. The Australasian Institute of Mining and Metallurgy, 1987.