The Underground Ore Handling System at Olympic Dam Project, South Australia

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
482 KB
Publication Date:
Jan 1, 1988

Abstract

With production at Olympic Dam scheduled to commence in June 1988, it has been necessary to install a complete underground ore handling system capable of removing two million tonnes of material annually from the mine. The system comprises mucking from stope drawpoints, truck haulage to underground storage, primary crushing, conveying and hoisting. On the surface, material is conveyed to stockpiles at the Metallurgical Plant. Mining of the numerous special excavations within the system was incorporated into the mine's ongoing development program prior to the underground construction phase. Utilisation of a decline from the surface enabled versatile construction equipment to operate at the underground sites as well as simplifying the transportation and delivery of construction Materials.
Citation

APA:  (1988)  The Underground Ore Handling System at Olympic Dam Project, South Australia

MLA: The Underground Ore Handling System at Olympic Dam Project, South Australia. The Australasian Institute of Mining and Metallurgy, 1988.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account