The Use of An-Fo Blasting Agent at Great Boulder Mine

The Australasian Institute of Mining and Metallurgy
Organization:
The Australasian Institute of Mining and Metallurgy
Pages:
8
File Size:
279 KB
Publication Date:
Jan 1, 1964

Abstract

To enable AN-FO .tòo' be used on an equal .weight basis wish Nitro Gl reerin.e expl3oòsives r smaller diameter bore holes became necessary With consequent modifications to drill steel and burden on holes, De't'onation of AN-FO "in small diameter holes proved successful' both with 'and without primer charges but some altorat-ions were required to. adopt Anolodeòr.s to the smaller -holes, Important factors in training all operators In the new charging method were the retention of imp-,cved, fragmentat'ion, avoidance of excel ive ove:break and keeping wall rock dilution 'to an absoluato mi. iArurle ò The ò successful storage of Ammonium 14t-rate in c"!ime.tic conditions 'with daily'.-' temperature fluctuationc above and below the critical' 90¦F, has. been "achieved,
Citation

APA:  (1964)  The Use of An-Fo Blasting Agent at Great Boulder Mine

MLA: The Use of An-Fo Blasting Agent at Great Boulder Mine. The Australasian Institute of Mining and Metallurgy, 1964.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account