Thompson Mine Geology

Canadian Institute of Mining, Metallurgy and Petroleum
Organization:
Canadian Institute of Mining, Metallurgy and Petroleum
Pages:
10
File Size:
6178 KB
Publication Date:
Jan 1, 1963

Abstract

The introduction consists of back-ground information, of an historical and statistical nature, relating to the Thompson mine. The geological presentation is based on illustrations that are intended to provide a progressively closer look at the ore occurrence. The illustrations consist of an index map, a geological map of a 15-by 85-mile area including the Thompson mine, a series of four maps dealing with the geophysics and geology of a 6-by 4\f.j-mile area at Thompson, a mine level plan and corresponding section, two sto11e 11lans and corresponding sections, and photo-graphs and photomicrogra11hs of the various one types. T HE Thompson mine is located about 400 miles due north of Winnipeg. The ore deposit was dis-covered in February, 1956. Five years later on March 25, 1961, the Thompson production facilities were officially dedicated with the shearing of the first nickel produced at the Thompson refinery. Full production, at an annual rate of more than 75,000,000 lbs. of refined nickel, was attained later in the year.
Citation

APA:  (1963)  Thompson Mine Geology

MLA: Thompson Mine Geology. Canadian Institute of Mining, Metallurgy and Petroleum, 1963.

Export
Purchase this Article for $25.00

Create a Guest account to purchase this file
- or -
Log in to your existing Guest account