Thunder Bay Terminals Ltd. - Terminal Plant Design

- Organization:
- Canadian Institute of Mining, Metallurgy and Petroleum
- Pages:
- 8
- File Size:
- 5560 KB
- Publication Date:
- Jan 1, 1979
Abstract
This paper discusses: (1) the need for Western Canadian coal in eastern Ontario Hydro plants; (2) design parameters-unit trains, year- 'round receiving from trains, and shipping (Great Lakes season); (3) equipment chosen-dumper-indexer, outhaul conveyor, yard belt, stacker, reclaimer, surge-bin feeders, shiploader, docking system and dust control; (4) foundation and soil conditions-dumper house, yard belt, surge bin and dock-piling-runway; (5) winter conditions- thaw shed, feeder, lump breaker, beltings (oil), and dust control and disposal; and (6) operations to date.
Citation
APA:
(1979) Thunder Bay Terminals Ltd. - Terminal Plant DesignMLA: Thunder Bay Terminals Ltd. - Terminal Plant Design. Canadian Institute of Mining, Metallurgy and Petroleum, 1979.