Time-Cost Trade-Off Analyses Of Longwall Face Transfers (9fed35d2-a29b-498b-8fbf-dd4e54acd8ad)

- Organization:
- Society for Mining, Metallurgy & Exploration
- Pages:
- 6
- File Size:
- 437 KB
- Publication Date:
- Jan 1, 1994
Abstract
Longwall face-to-face equipment transfers or moves are, for many companies, the largest single source of non-productive time in a longwall mining system. Detailed planning and resourceful thinking are paramount for economical, safe, and timely longwall moves. New equipment and innovative techniques are frequently tested in order to reduce overall move time. Determining the cost effectiveness of these ideas is difficult since the decision is influenced by many subjective factors. A project scheduling simulation model of the longwall move process was developed in order to analyze and assess the economic viability of innovative transfer methods and equipment. The model provides a project duration frequency distribution and lists of critically indexed activities and paths. It compares the monetary savings from reduced transfer time and capital costs for several innovative ideas.
Citation
APA:
(1994) Time-Cost Trade-Off Analyses Of Longwall Face Transfers (9fed35d2-a29b-498b-8fbf-dd4e54acd8ad)MLA: Time-Cost Trade-Off Analyses Of Longwall Face Transfers (9fed35d2-a29b-498b-8fbf-dd4e54acd8ad). Society for Mining, Metallurgy & Exploration, 1994.